Graycliff Exploration Continues Intersecting High Grade Gold Intervals Near Surface Including 52 g …

Obviously, further confirmation of exceptional high-grade results is getting us extremely excited about the potential results that the 3D modelling will show following the receipt of all of the results from our phase two drilling program,” stated President and CEO, James Macintosh.

The two high-grade gold intersections intersected drill hole J-9-21 is located approximately 20 m down-dip of the mineralization reported from drill hole J-8-20 that highlighted an interval grading 67 g/t Au over 3m and both holes J-8-21 and J-9-21 are below hole J-7-20 .

The Company’s Shakespeare Project consists of one crown patented lease, two crown leases and 40 claims on a property associated with the historic Shakespeare Gold Mine, which operated from 1903 to 1907.

Although the Company believes that the expectations and assumptions on which such forward-looking information is based on are reasonable, undue reliance should not be placed on the forward-looking information because the Company can give no assurance that they will prove to be correct.

…Read the full story